How long does it take do these changes?

Gubben

New Member
May 19, 2024
21
2
The thread says it all please get back to me, and how long does it take to add badges and text to the hotel page? (so people can purchase VIP\others.
  • one language on all of the furnitures and catalog
  • fix building stacks so its not having to repetitive clicking for it to go on top of another furnitures
How long does it take to fix diagonal walk?
No rare furniture, only normal furniture.
No customized furniture in the regular catalogue, only for VIP 1-3.
Starts with 40 coins on each account, only allowed with one account.
  • Rollers must also be fixed
  • Wired must be fixed proper name on all of them
  • rotation commands when placing a furni
  • Show message on Wired needs to be added
Normal rank users will only have the Normz (Normal catalogue) /Classic
  • Automatic transfer of coins / VIP / furniture that is bought on the hotel's website (we may add this to the catalog as well for easier purchases).
  • Allow all users regardless of their rank to use Floor Plan editor
  • furniture must be able to move and rotate as it is supposed to
  • badges for those on the staff list, and VIP
  • Matching dice throwers in transparent glass

VIP 1: Tiger (Tiger) (No Power in Hotel) But lots of FANCY COMMANDS - LESS THEN WOLF)
VIP 2: Ulv (Wolf) (No Power in Hotel) But lots of FANCY COMMANDS) LESS THEN GOAT)
VIP 3: Geit (Goat) (No Power in Hotel) But lots of FANCY COMMANDS)

How long would you guys estimate this would take?
 

JayC

Always Learning
Aug 8, 2013
5,497
1,398
Why are you looking for an estimate on time? You have vastly different things in this list.
One language on all of the furniture and catalog.
This is highly dependent on your database and catalog. You could have a few hundred items requiring translation and fixing, or you could have thousands. This could take a day, a week, or even longer.

You have adding new commands, changing existing functionality, a few minor things of updating the database...
 

JayC

Always Learning
Aug 8, 2013
5,497
1,398
  1. Adding badges and text to the hotel page for VIP and others:
    • Estimate: 2 hours
  2. Standardizing one language on all furniture and catalog:
    • Estimate: 3-5 days (depending on the number of items and complexity)
  3. Fixing building stacks to avoid repetitive clicking:
    • Estimate: 3 hours
  4. Fixing diagonal walk:
    • Estimate: 4 hours
  5. Removing rare furniture and only including normal furniture:
    • Estimate: 1 hour
  6. Customizing furniture for VIP 1-3 only:
    • Estimate: 1 hour
  7. Starting with 40 coins on each account and restricting to one account per user:
    • Estimate: 5 minutes
  8. Fixing rollers:
    • Estimate: 3 hours
  9. Proper naming for wired items:
    • Estimate: 1 day
  10. Adding rotation commands when placing furniture:
    • Estimate: 4 hours
  11. Adding "Show message" functionality on Wired:
    • Estimate: 2 hours
  12. Restricting Normal rank users to Normz/Classic catalog:
    • Estimate: 2 hours
  13. Automatic transfer of coins/VIP/furniture purchased on the hotel's website:
    • Estimate: 6-8 hours (+ add emulator support for online users)
  14. Allowing all users to use the Floor Plan editor regardless of rank:
    • Estimate: 1 hour
  15. Ensuring furniture can be moved and rotated properly:
    • Estimate: 30 minutes per furniture item (debugging, might include file updates)
  16. Creating badges for staff and VIP:
    • Estimate: 1-2 days
  17. Matching dice throwers in transparent glass:
    • Estimate: 1 day

VIP Commands Implementation:​

  1. VIP 1 (Tiger) Commands:
    • Estimate: 30 minutes (setup and testing)
  2. VIP 2 (Wolf) Commands:
    • Estimate: 30 minutes (setup and testing)
  3. VIP 3 (Goat) Commands:
    • Estimate: 30 minutes (setup and testing)

Total Estimated Time:​

1-2 weeks
Post automatically merged:

Those are completely shoot-from-the-hip estimates. I have no idea of your setup (catalog, emulator, etc.). Those estimates are just quick thoughts on how long I would think it would take to make the changes and validate them.
 

Gubben

New Member
May 19, 2024
21
2
  1. Adding badges and text to the hotel page for VIP and others:
    • Estimate: 2 hours
  2. Standardizing one language on all furniture and catalog:
    • Estimate: 3-5 days (depending on the number of items and complexity)
  3. Fixing building stacks to avoid repetitive clicking:
    • Estimate: 3 hours
  4. Fixing diagonal walk:
    • Estimate: 4 hours
  5. Removing rare furniture and only including normal furniture:
    • Estimate: 1 hour
  6. Customizing furniture for VIP 1-3 only:
    • Estimate: 1 hour
  7. Starting with 40 coins on each account and restricting to one account per user:
    • Estimate: 5 minutes
  8. Fixing rollers:
    • Estimate: 3 hours
  9. Proper naming for wired items:
    • Estimate: 1 day
  10. Adding rotation commands when placing furniture:
    • Estimate: 4 hours
  11. Adding "Show message" functionality on Wired:
    • Estimate: 2 hours
  12. Restricting Normal rank users to Normz/Classic catalog:
    • Estimate: 2 hours
  13. Automatic transfer of coins/VIP/furniture purchased on the hotel's website:
    • Estimate: 6-8 hours (+ add emulator support for online users)
  14. Allowing all users to use the Floor Plan editor regardless of rank:
    • Estimate: 1 hour
  15. Ensuring furniture can be moved and rotated properly:
    • Estimate: 30 minutes per furniture item (debugging, might include file updates)
  16. Creating badges for staff and VIP:
    • Estimate: 1-2 days
  17. Matching dice throwers in transparent glass:
    • Estimate: 1 day

VIP Commands Implementation:​

  1. VIP 1 (Tiger) Commands:
    • Estimate: 30 minutes (setup and testing)
  2. VIP 2 (Wolf) Commands:
    • Estimate: 30 minutes (setup and testing)
  3. VIP 3 (Goat) Commands:
    • Estimate: 30 minutes (setup and testing)

Total Estimated Time:​

1-2 weeks
Post automatically merged:

Those are completely shoot-from-the-hip estimates. I have no idea of your setup (catalog, emulator, etc.). Those estimates are just quick thoughts on how long I would think it would take to make the changes and validate them.
I'm using AtomCMS & Nitro.
 

lBambuco

Member
May 20, 2020
34
7
I'm using AtomCMS & Nitro.
I think you have been answered that question in several places, and more than a problem with this is really to see how you generate a waste of time, testing everything to verify your knowledge, I sent a lot of videos doing what you asked for, you tried it, I gave you an estimate and then you stopped responding ignoring anything else. idk
 

Bran

habcrush.pw
Mar 13, 2017
1,740
1,542
you should just do it and find out, learning how to do things for your hotel and doing them yourself will save you a lot of time (& money)
 

Users who are viewing this thread

Top